Final Detail

Pioneering Pressure Vessel Design Software since 1975

After the preliminary estimate has been made, final adjustments in the areas of material cost, total manhours, labor rate, weld rod cost, overhead cost and profit margin can be made from this menu.

finalest

The estimate can be updated at a later date when requested price quotes for parts have been returned to the estimator. This window will always follow any upgrades to allow for a quick review or material cost, labor cost and manipulation of other information included in the estimate.

[Disasu Software] [Design] [Analysis] [Drawings] [Estimating] [Material Takeoff] [Labor Takeoff] [Final Detail] [Bonus Features] [Downloads] [Contact Us]